
Supporting AerFin’s Supply Chain through onsite logistics and co-ordination at a prominent Aircraft Teardown site in Hong Kong
Challenges
AerFin faced major challenges during its aircraft teardown project in Hong Kong, including a tight schedule, limited storage, and rising freight costs. These constraints tested logistics coordination and regional expertise in a high-pressure supply chain.
Our Approach
Tight Deadlines & Manpower Shortages
Despite the teardown supplier’s staffing constraints, B&H Worldwide’s agile planning and close coordination ensured continuous operations with zero disruption.
Limited Storage in Hong Kong
With aerospace-grade storage scarce, B&H Worldwide leveraged its local network to secure compliant, cost-effective facilities, keeping AerFin’s schedule on track.
Seasonal Freight Cost Volatility
Amid peak-season rate surges, B&H Worldwide used carrier partnerships to negotiate competitive transport solutions, maintaining both timelines and budgets.
Results
- Seamless 6-Aircraft Teardown: Managed the end-to-end recovery, crating, and export of components for a major multi-fleet project in Hong Kong.
- 100% Asset Traceability: Provided instant "chain of custody" via FirstTRAC, including real-time part photography and documentation for every dismantled component.






